New Road Network (5G) at “Valle del Cauca”

Last August, the Consorcium “Autopista del Caribe”, formed by CEMOSA COLOMBIA, VQ Ingeniería S.A.S. and ICOEM Colombia S.A.S., was awarded the comprehensive audit for the concession contract for the new road network Project of Valle del Cauca that will connect through this corridor with the Cali and Palmira accesses, being the first 5G road in Colombia.

The initiative will benefit more than 3.300.000 habitants from 17 different municipalities in the departments of Cauca and Valle del Cauca.

At CEMOSA COLOMBIA, we remain committed to the development of the country’s infrastructure, which is why we actively participate, promoting the connection between regions and the urban development of our cities.

Expansion of the South Area of Seville Airport

The Seville Airport South Area Expansion has recently been opened to the public.

As an example of our multidisciplinary character, CEMOSA has provided a wide range of services in this great infrastructure project, carrying out:

  • Architectural Design.
  • Basic and Construction Project.
  • Site and Project Management.
  • Health and Safety Coordination.
  • Contrast testing.
  • Topography.

Some of these services, in joint venture with our friends from Inse Rail S.L.

The new south area has 7,565 square meters divided into two floors, with different service and rest areas, as well as three restaurants, stores, work areas and exhibition spaces.

One of the objectives of this major project is for San Pablo Airport (Seville) to serve more than 10 million passengers, a figure that far exceeds the record numbers for 2019.

This work represents a 42% increase in the surface area of the terminal building. It also has a total of 19 boarding gates, including the domestic flights and international Schengen flights.

Click here to know more about the project: https://youtu.be/5vg2mD28tmk

New Photovoltaic Plant (100 MW) in Magdalena, Colombia.

At CEMOSA COLOMBIA, we remain committed to actively participate in the Energy Transition of the country.

As evidence of this, we have signed our first Renewable Energy contract for the Design and Detailed Engineering of the Project ‘Fundación del Verano Solar’, a Photovoltaic Plant with a capacity of 100MW, located in the Department of Magdalena.

The Project will start next year 2023, and it is integrated by Enel Green Power (Colombia), Eiffage Energía, UPME, Ministerio de Minas y Energía and Expo Solar.